[Solved] EE6225 Assignment 2

$25

File Name: EE6225_Assignment_2.zip
File Size: 178.98 KB

SKU: [Solved] EE6225 Assignment 2 Category: Tag:
5/5 - (1 vote)

Consider a Consider a 33 process given by Orgunnaike and Ray (1979); the transfer function matrix is obtained by empirical modeling technique as:

Try to design following controllers using ETF based methods

  1. Decentralized control
  2. Spases control
  3. Decoupling control

Compare the performance with the control system based on classical decentralized BLT control method by simulating the closed-loop performances for step response R1(t)=1 for t>0, R2(t)=1 for t>50 and R3(t)=1 for t>100, respectively. (try to adjusting the the simulation time frame if the simulation horizens are not suitable).

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shopping Cart
[Solved] EE6225 Assignment 2[Solved] EE6225 Assignment 2
$25