Power Generation Planning (PGP2)

Power Generation Planning (PGP2)
Problem: select power generators that minimize the total cost of supplying enough electricity to satisfy regional demand.

Copyright By Assignmentchef assignmentchef

Stage 1: (must decide in advance) how much capacity to acquire for each type of generator. (e.g.,gas, coal, nuclear)
Stage 2: (can postpone until the demand is seen) how much electricity to generate, once the demand is observed.
Demand is random for planning purposes.

Load Curve (Demand)

SymbolMeaning
Capacity for generator type(kw)
Stage 1 decision
Annualized capital cost ($/kw)
Budget ($)
Minimum capacity requirement (kw)
Operating cost ($/kw-hr)
Load duration (hour)
kw of demand segmentserved using generator type(kw)
Stage 2 decision
Demand during load (random, kw)

Budget constraint
Minimum capacity
Operating cost
Cannot exceed capacity
Must meet demand

All-in-one

SymbolMeaning
Capacity for generator type(kw)
Stage 1 decision
Annualized capital cost ($/kw)
Budget ($)
Minimum capacity requirement (kw)
Operating cost ($/kw-hr)
Load duration (hour)
kw of demand segmentserved using generator type(kw)
Stage 2 decision
Demand during load (random, kw)

* Index sets:

Data and Scenarios
The random vectoris defined by marginal distributions.
Assume independence.

Each possible combination ofwill become one scenario.

/docProps/thumbnail.jpeg

CS: assignmentchef QQ: 1823890830 Email: [email protected]

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shopping Cart
[SOLVED] CS Power Generation Planning (PGP2)
$25