, , , , , ,

[SOLVED] CP1402 Assignment – Networking Case Study Processing

$25

File Name: CP1402_Assignment_-_Networking_Case_Study_Processing.zip
File Size: 489.84 KB

5/5 - (1 vote)

CP1402 Assignment – Networking Case Study

Due Sunday of Week [email protected]

Introduction

This case study has been divided into three (3) components.

You are to design a network, research and source appropriate devices justifying choices

(feasibility, efficiency, etc.), subnet the network, and assign IP addresses to the appropriate devices.

Deliverables

1.   A SINGLE pdf (.pdf) – containing all parts

Assignment breakdown

Scenario

grandData Inc., an Australian data analytics company, has asked you to assess and redesign their network. They are opening a new branch in Sapporo, which will require new equipment. They have existing contracts and hardware to maintain fibre-optic leased line WAN links between sites.

PART 1 – Network diagram

PART 2 – Subnet the network and assign IP addresses to the appropriate devices

PART 3 – Research and source appropriate devices justifying choices (feasibility, efficiency, etc.) with a Weighted Scoring Model (WSM)

PART 1 – Network specifications and diagram

Network Specifications

You have been given a rough sketch of the network topology below. You are to draw the network using draw.io (https://app.diagrams.net/), subnet the network (see Part 2), and assign port numbers and IP addresses to ports. Also, label the networks and devices.

Network Structure

Hardware

•   Only include one switch in your diagram for each LAN or WLAN (even if more are required).

•   Servers are to be on their own LAN.

•   The Internet router port address is 199.202.35.1/30.

•   The Sydney router is connected to the Internet and provides access to the public backbone, which contains a mail server, a web server, and a database server.

PART 2 – Subnet the network using VLSM and assign IP addresses to the appropriate devices.

Each location has the following number of hosts

Location

Workstations

WLAN addresses

Sydney

1020

80

Dunedin

450

Copenhagen

900

Mumbai

480

Kuala Lumpur

252

Sapporo

150

100

Use VLSM to subnet the network topology using a public class B network. You are to use the table format below to provide the subnet details.

Table 1. Subnets (including WAN subnets)

Spreadsheet Columns:  Subnet name, subnet address, subnet mask (in slash format ONLY), first useable address, last useable address, broadcast address, static address range and DHCP address range (all addresses to be in dotted decimal notation)

Table 2. Router Interfaces

Spreadsheet Columns:  Location, interface, IP address, subnet mask (in slash format ONLY) Table 3. Servers

Spreadsheet Columns:  Location, server name, IP address, subnet mask (in slash format ONLY) Additional requirements:

Choose one public B class network address for the entire network and subnet this block of addresses to optimise spare addresses for future expansion.

•    Place the WAN subnets in the blocks directly following the LAN/WLAN address space (i.e.,

finish putting all the LAN/WLAN subnets in the table first, then follows by the WAN subnets).

ADD 100% to each subnet to allow for growth in the number of hosts specified for each LAN (i.e., workstations × 2).

o DO NOT ALLOW for any growth in the number of servers or size of WLANs.

•    DHCP will to be used for IP address allocation for hosts in each subnet and these ranges are to be allocated for each LAN.

•   Static IP addresses are to be allocated where appropriate: router interfaces and servers.

•   The ISP has given us an IP address of 199.202.35.1/30 for our Internet connection at Brisbane. Note: this address is part of the ISP’s network, and is NOT involved in subnetting for the corporate network.

PART 3 – Research and source appropriate devices justifying choices (feasibility, efficiency, etc.)

You are to research and submit a project procurement plan for the Sapporo network. The devices you must include are routers, switches, and wireless access points. Make sure the devices you select can handle the number of workstations required and provide a good quality of service to wired and wireless users. Devices should be enterprise-grade, not home or gaming equipment.

Your project plan and final recommendations should be based on a Weighted Decision Matrix (like the WDM you did in the Procurement Practical). You are to compare three (3) devices from each category and to base the decision on reasonable and well-justified attributes.

The budget for procurement is $5,500. You may exceed this if you can justify it well. Your project plan is to contain the following components:

Weighted Decision Matrix – hardware resource requirements analysis

•    Include a written justification for priorities and attributes given in the matrix

•   Create your WDMs in Excel and copy and paste them into your document

Budget

•   Create a well-presented table of the prices of all devices and the total cost

•    Include hardware only, not labour

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

Shopping Cart
[SOLVED] CP1402 Assignment – Networking Case Study Processing
$25