Rate this product
1 Introduction
There is definitely something wrong with the world nowadays. Lots of lots of strange incidents, one after another Not only our world, though, Middle-Earth1 is also going through a rough patch.
Orcs have gone away and the others have fallen out with each other. They have formed small communities and the wars have begun. Communities attack one another, they try to kill the rival hobbits and capture more territories. The future of the Middle-Earth is desperately gloomy. But, you can help them, you can end this freaking, useless, lose-lose turmoil! You can lead the people of the Middle-Earth out of the darkness, right towards the bright horizons!
What can I do?, you asked? Simple! Just predict the winner of the fights even before they began. They would listen to you and stop the fight; you are a true leader!
This is a difficult mission to undertake and we will help you as well. Together, we will end this non-sense the only way we know how: coding! We already started to work, but desperately need you to complete the key parts.
2 War Rules
Even wars have rules, and this also holds in the Middle-Earth. Here they are:
Middle-Earth hosts five different character types: Hobbits, Men, Elves, Dwarfs, and Wizards. Each community contains exactly one of these characters; 5 characters in total.
Only two communities involve in a war and they attack each other in rounds. The attack is performed by a character of the attacking community towards a character in the defending community. For instance, in round 1, the Wizard of community 1 can attack the Dwarf of community 2 and in round 2 the Men of community 2 can attack the Hobbit of community 1. As a convention, community 1 attacks first.
1Wikipedia page of Middle-earth
1
- Each character has predefined attack and defense points. The damage of an attack is computed by subtracting the defense point of the defender from the attack point of the attacker. If the damage is larger than 0, the health of the defender decreases by that amount. When the health of a character drops to 0 or below, the character is dead. As an edge case, negative health scores are considered as 0.
- If a dead character tries to attack or defend, it is replaced by the name-wise alphabetically next alive character in its community. If there is no alphabetically next alive character, then it is replaced by the alphabetically previous alive character.
- Hobbit is the most important character type. If the hobbit of a community dies, the community loses the war. In addition, if all other community members die, Hobbit becomes defenseless and the war is lost again.
- The maximum number of rounds a war can last is predefined. If none of the end conditions is met when the round limit is reached, the war ends in a draw.
- Some characters have special skills that they might use per certain number of rounds.
- Elves can convey half of their health (integer division) to the hobbit of its community per 10 rounds. In other words, at least 10 rounds must pass for an Elf to trigger its special skill, since the beginning of the war and the last use of the skill. After using the special skill, Elves can still attack the defender.
- Dwarfs can call another dwarf with its own attributes and they attack defender together. This doubles the damage on the opponent for this round and then the callee disappears. Dwarfs can trigger this skill per 20 rounds.
- Wizards can turn the last killed community member back to life with the initial health of the killed member, per 50 rounds. After the resurrection, the wizard still attacks the defender. If all members of the community are alive, the special skill is not triggered at all, so that the wizard would not have to wait for 50 rounds.The rules are set! All you need to do is to answer the questions below before the war starts. Hurry!Winner Who is the winner? Community-1, Community-2, or Draw?Number of Rounds How many rounds did the war last? Remember, rounds start from 1.Number of Casualties How many characters would die if the war actually had happened? Let them know how many lives you saved.Health Records How would the health of the characters would progress during the war? Let them know how a war would make them suffer.Now let us discuss what we already did for you.
2
3 Starter Codebase
We created three files: Character.h, Character.cpp, and main.cpp, where you will need to edit only Character.cpp and main.cpp. In other words, Character.h is already completed for you and you will fill in the methods in Character.cpp to create the characters. Besides, you need to edit main.cpp to perform I/O operations and simulate the wars.
3.1 Character.h/cpp
This class consists of the attributes of characters, constructors, operator overloaders, and de- structor. Even though you might not use all the class attributes and functions depending on your code, you must fill every one of them. Let us describe each class attribute:
isAlive Whether the character is alive.
name A unique identifier of the character. Can be any string, like Frodo.
type Type of the character. One of Hobbit, Men, Elves, Dwarfs, Wizards.
remainingHealth The remaining health of the character. The initial value will be provided as input.
attack Attack point of the character.defense Defense point of the characternRoundsSinceSpecial How many rounds have passed since the special skill has been used. nMaxRounds Number of maximum rounds in the war.
healthHistory A pointer to record the health history of the character for each round. The history should record the health before and after the war as well, which means if a war lasts 100 rounds, this variable should store 101 values.
3.2 main.cppThis is the class where you will be handling the input, output, and war simulation. You should
use the Character class, its methods and combine it with the simulation code. 4 Input & Output
Your code must read the name of the input and output files from the command line. We will run your code as follows:
g++ main.cpp Character.h Character.cpp -std=c++11 -o project1.out ./project1.out inputFile outputFile
Make sure that your final submission compiles and runs with these commands.
3
4.1 Input
Figure 1: Sample input (left) and output (right) files
All input files have the following format:The first line states the maximum number of rounds this war can last and the next 5 lines
list the characters of the first community. Each of these lines comprise two strings and three integers to denote the character name, type, attack point, defense point, and initial health, respectively. The next 5 lines contain the same information for community-2, in the same format.
The community descriptions are followed by maximum number of rounds lines. Each of these following lines specifies the attacking move in the corresponding round by three strings: name of the attacker, name of the defender, whether the attacker triggers the special skill or not. Note that the attacker cannot trigger a special skill arbitrarily, even if it tries to do so: a number of necessary rounds must pass to reload the skill and the character must have a special skill in the first place!
Below is the input template and Figure 1 displays an example input on the left.
max number of roundscommunity1 char1 name type attack defense healthcommunity1 char2 name type attack defense healthcommunity1 char3 name type attack defense healthcommunity1 char4 name type attack defense healthcommunity1 char5 name type attack defense healthcommunity2 char1 name type attack defense healthcommunity2 char2 name type attack defense healthcommunity2 char3 name type attack defense healthcommunity2 char4 name type attack defense healthcommunity2 char5 name type attack defense healthattacker name defender name attacker name defender name if special attacker name defender name if specialattacker name defender name if special
4
Round-1 Round-2 Round-3 Round-4 Round-5
Audie attacks Carey without special skill. Audies attack point is 10, and Careys defense is also 10. So, there is no damage given to Carey.Jonnie attacks Audie. Jonnies attack point is 12 and Audies defense point is 6. 6 damage is given to Audie, which is reduced from her health.
Audie attacks Carey. Audies attack point is 10 and Careys defense is also 10. So, there is no damage given to Carey.Davis attacks Daryl. Davis attack point is 8 and Daryls defense is 5. 3 damage is given to Daryl, which is reduced from his health.
Leigh attacks Davis. Leighs attack is 12 and Davis defense is 6. 6 damage is given to Davis, which is reduced from his health. It is normally a special skill round but men do not have a special skill. So, there is nothing different than a NO-SPECIAL round, in practice.
Query-1 Query-2 Query-3 Other Queries
First query is who the winner is. It is draw because none of the two end conditions occurred.Next query needs us to print the number of rounds passed. 5 rounds have passed in total, and we print 5.
Next query asks the total number of casualties. None of the characters is dead, so it is 0.Next queries are to display the health records of characters round by round.
Table 1: Explanation of the expected output file
attacker name defender name if special attacker name defender name if special attacker name defender name if special attacker name defender name if special
.
4.2 Output
The output file must consist of 13 lines. The first line must state the winner: Community-1, Community-2, or Draw.
Each of the second and third lines must contain one integer to denote the number of rounds passed and total number of casualties, respectively.
The remaining 10 lines must have the same format. They must contain the health record of each character in the order they were presented. Each line must start with the name of the character and must be followed by a space-separated list of integers. Keep in mind that the size of the health records is equal to the number of rounds the war lasted plus 1.
Figure 1 illustrates the output for the sample input and Table 1 describes the war round- by-round for the same file.

![[Solved] CMPE 250, Data Structures and Algorithms,Project 1- The New Normal in Middle-Earth](https://assignmentchef.com/wp-content/uploads/2022/08/downloadzip.jpg)

![[Solved] CmpE 250-Data Structures and Algorithms Assignment 3](https://assignmentchef.com/wp-content/uploads/2022/08/downloadzip-1200x1200.jpg)
Reviews
There are no reviews yet.